VnExpress International (VN) · top story ·
Saigon River pedestrian bridge's 3,400-ton steel arch moves onto barge in 4-hour operation
First seen . It ran for 2 hours 59 minutes.
Read the story at VnExpress International (VN)See it on the timeline →
All headlines for this story
- Saigon River pedestrian bridge's 3,400-ton steel arch moves onto barge in 4-hour operation this headline top story · · ran for 2 hours 59 minutes
- Saigon River pedestrian bridge's 3,400-ton steel arch moves onto barge in 4-hour operation slot 5 · · ran for 10 hours
Proof
This record was timestamped on 16 Oct 2026 and saved by the Internet Archive.
Archived copy of this page · Archived front page · Download the record · Download the timestamp
Fingerprint: 2d7290e168eae782b1184a345d74ea3cbdcc7ce03649f23ccab4bfa1d3c79d81